The subsea cable network installation process includes:
- Construction oversight to ensure the subsea cable project is manufactured to specification, to budget, to schedule, and within required HSSE frameworks.
- Installation oversight to ensure that the various parts of the system from the Cable Landing Stations (CLS) through the terrestrial cable installation, the beach manhole, shore works and shallow water installation to the deepwater installation, are all installed to plan and budget , and in accordance with any permitting and environmental regulations that the authorities may enforce.
- System monitoring and network management/operations to support the network utilization requirements, and to ensure the network achieves the operational results as designed in the planning phase.
- Operations and maintenance negotiations to ensure the network is protected from both natural and external aggression risks, and to ensure appropriate repair and mitigation procedures are in place to maintain system performance.